When an evaluator, task, or candidate is corrected, the original failure remains intact. The correction begins a new evidence branch with its own identity, scope, and burden of proof.
Governing rule
A correction may earn successor evidence. It cannot manufacture retroactive success.
Context
AlexOS encountered failed and invalid evaluation outcomes alongside defects in the institution doing the judging. Treating the corrected rerun as if the first result had passed would erase the event that justified the correction and blur which identity actually earned which result.
Current state
The original outcomes remain preserved. Corrected evaluators and candidates receive successor identities, and a later RC9-to-RC12 handoff earned one bounded mechanics pass. RC9 remains active; RC12 remains experimental; broader promotion remains withheld.
Current evidence
What the record supports.
Lineage stages
5
Original failure
Preserved
Retroactive pass
Never
Active identity
RC9
Successor status
RC12 experimental
The original task, output, evaluator decision, and failure classification remain intact
The evaluator challenge is recorded rather than folded into the candidate score
A correction creates a distinct successor record
The bounded mechanics pass belongs only to the successor evidence
Authority does not transfer until the applicable successor checks are earned
Public evidence files
Inspect the record.
Public-safe derivatives only. Source availability does not broaden the claim stated on this page.
Public lineage registerThe sanitized event-to-successor map remains under source, date, and privacy reviewWithheld
Original evaluation packagesProtected prompts, outputs, and implementation detail remain outside the public surfaceWithheld
Successor test receiptsOnly reviewed, public-safe receipts may become downloadable evidenceWithheld
Claim boundary
What remains unearned.
Not proof that the corrected evaluator is generally valid
Not a promotion of RC12
Not an erasure or reclassification of the original failure
Not independent validation
Not production readiness or automatic-routing authority
Next evidence
Complete the preregistered successor tests and preserve every result—pass, failure, invalid, or blocked—under the identity and scope that actually produced it.